Investors

News Releases

Roscan Gold Drills 6.15gpt over 46.5m, Intersects Fresh Rock and Confirms Northern Extension of the Southern Mankouke Mineralization Trend

August 12, 2020

Toronto, Ontario. – August 12, 2020 – Roscan Gold Corporation (“Roscan” or the “Company”) (TSX-V: ROS; FSE:2OJ; OTC:RCGCF) is pleased to announce positive diamond drill results (Figure 1) from an additional 20 holes totaling 3,788 meters (m) at its Mankouke South Target. DDMan-20-54 (Figure 1 and Figure 3) intersected 6.15 gpt over 46.5m from 118.5m, which has increased the width of the mineralized zone to 125m. Hole DDMan-20-61 intersected 2.76 gpt over 6m including 9.55 gpt over 1m in Fresh Rock and increases vertical depth of mineralization to 173m (Figure 3).

The Government Aeromagnetic Survey (SYSMIN), which covers both the Kandiole Project area (Figure 4) and the area of hole DDMan-20-59, indicates that the Southern Mankouke Mineralized Trend is faulted off to the West, and the continuation of the Northern Mineralization Trend is shown by DDMan-20-59.

Drilling Highlights:

Southern Mankouke – Diamond Drill Holes

  • 6.15 gpt gold over 46.5m from drill hole DDMan-20-54 from 118.5m;
  • 5.20 gpt gold over 41.0m from drill hole DDMan-20-57 from 38.5m;
  • Including 52.6 gpt over 1.0m from 61.5m
    • And 2.01 gpt gold over 25.0m from 7.5m
  • 3.98 gpt gold over 68.0m from drill hole DDMan-20-56 from 7.5m;
  • 4.89 gpt gold over 22.0m from drill hole DDMan-20-59 from 7.5m;
  • 4.18 gpt gold over 17.0m from drill hole DDMan-20-52 from 133.5m;
    • And 9.57 gpt gold over 7.0m from 157.5m
  • 2.92 gpt gold over 18.0m from drill hole DDMan-20-50 from 114.5m;
  • 2.76 gpt gold over 6.0m from drill hole DDMan-20-61 from 146.4m;
    • Including 9.55 gpt over 1.0m from 151.4m
  • 1.98 gpt gold over 47.0m from drill hole DDMan-20-48 from 6.5m.

Air Core Drilling

  • 3.00 gpt gold over 20.0m from drill hole ACMan20-467 from 8.0m;
  • 1.12 gpt gold over 36.0m from drill hole ACMan20-469 from 12.0m;
  • 2.80 gpt gold over 12.0m from drill hole ACMan20-660 from 34.0m;
  • 1.79 gpt gold over 20.0m from drill hole ACMan20-663 from 30.0m (End of Hole);
  • 1.62 gpt gold over 12.0m from drill hole ACMan20-665 from 38.0m; (End of Hole).

Notes: 1: True width yet to be determined, 2: Table 1 – Assay Highlights, 3: 0.5gpt used as cut-off with 4m internal dilution for drill holes at Mankouke South, and 2m internal dilution for regional drill holes, 4: No top-cut.

AC regional fence drilling tests termite mound anomalies. In the event that significant results are returned, first follow-up is generally more AC fence drilling along strike and if mineralization of significant grade is confirmed over a significant strike distance, follow-up is done with RC and / or DD drilling. These 314 AC holes aided us to establish 200m strike length at northern extension to date.

Nana Sangmuah, President and CEO, stated, “These positive results demonstrate the extension of the Southern Mankouke mineralization to the North, based on the offset which the Geophysics identified in Figure 4. We have traced this new zone over 200 meters in strike length and continue to increase the foot print of the deposit. We are very excited to intersect gold in the fresh rock again and increase the depth of mineralization at Mankouke South. We remain focused on testing the full potential of our tenement package in order to yield more discoveries and expand on Mankouke South (Figure 2). Drilling in 2020 should unlock the potential of our highly prospective land package leading to more news flow in the coming weeks.”

Please see the pdf version of this release to view the associated figures

Figure 1: Plan View delineating the offset to the North and expansion to the West

Figure 2: Cross Section depicting Depth and High Grade Continuity – DDMan-20-57

Figure 3: Cross Section depicting the Extension to the West and Vertical Depth – DDMan-20-61

  • Drill hole DDMan-20-54 intersected one of the highest gram meters to date at Southern Mankouke. This drill hole, when coupled with previously high-grade drill holes, shows the persistent high grade nature of the deposit.
  • Drill hole DDMan-20-61 indicates a westerly dip of the mineralized zone, intersected the fresh rock and increased the vertical depth of the mineralization. This hole identifies the potential of the deposit to the west and we will continue to drill to clearly understand the extents.
  • DDMan-20-59 confirms the offset to the northwest whereby the mineralization picks up again on the northern portion. Also, the rock texture north of the offset is similar to that of southern portion of Mankouke South.

Figure 4: Geophysics data showing the offset and major structure on Kandiole Project

The gold mineralization at Mankouke South is associated with quartz veining (Figure 5 and Figure 6) and/or disseminated and stringer pyrite hosted in brecciated, silicified and locally sheared greywackes and mudstones underlain by interbedded limestones and mudstones of the Kofi Formation. Mankouke South is located approximately 25km east of the Fekola mine (B2Gold Corp.).

Figure 5: Drill Core Photo DDMan-20-59 (Northern Extension) showing high grade sections mineralization style comparable to Mankouke South Zone DDMan-20-57 (Figure 6)

Figure 6: Drill Core Photo DDMan-20-57 (Mankouke South Target) showing broadly high grade sections similar to Hole DDMan-20-59 (Northern Extension)

Drilling Contract and Analytical Protocol
The drilling contracts were awarded to Target Drilling SARL and Geodrill who both employ multi-purpose (AC/RC/DD) rig and AC rigs at the Kandiole Project. The AC drilling is mainly focused on drilling exploration targets.

All diamond drill samples are sent for preparation to Bureau Veritas Mineral Laboratories in Bamako, Mali and transported by Bureau Veritas to their analytical facility in Abidjan, Ivory Coast for fire assay with atomic absorption finish and by gravimetric finish for grades above 10gpt Au. Most the AC drilling was sent to SGS. Roscan applied industry-standard QA/QC procedures to the program. Certified reference materials, blanks and field duplicates are inserted at appropriate intervals.

Table 1: Drillhole Highlights at Mankouke South (August 11th, 2020)

Hole ID

Section

 

From 

To

Interval (m)

gpt Au

 

 

 

 

 

 

 

DDMAN20-42

1376200

 

 

 

 

NSR

DDMAN20-43

1376200

 

 

 

 

NSR

DDMAN20-44

1375700

 

8

10

2

1.14

 

 

 

24

25

1

0.97

 

 

 

31

34

3

1.87

 

 

 

39

57

18

2.11

 

 

including

41

43

2

9.43

 

 

 

99

100

1

0.91

 

 

 

127

128

1

0.79

DDMAN20-45

1376200

 

 

 

 

NSR

DDMAN20-46

1376400

 

 

 

 

NSR

DDMAN20-47

1375700

 

30

31

1

0.61

 

 

 

46

61

15

1.05

 

 

 

103

130

27

1.36

 

 

 

146

152

6

3.47

 

 

 

157

165

8

0.96

DDMAN20-48

1376000

 

6.5

53.5

47

1.98

 

 

including

35.5

38.5

3

5.35

 

 

and

49.5

51.5

2

6.68

 

 

 

86.5

87.5

1

1.31

 

 

 

96.5

103.5

7

2.62

DDMAN20-49

1375650

 

 

 

 

NSR

DDMAN20-50

1376000

 

28.5

35.5

7

1.5

 

 

 

47.5

48.5

1

0.8

 

 

 

65.5

70.5

5

0.85

 

 

 

82.5

88.5

6

1.06

 

 

 

114.5

132.5

18

2.92

 

 

including

119.5

121.5

2

19.8

 

 

 

142.5

145.5

3

2.64

 

 

 

155.5

156.5

1

0.51

DDMAN20-51

1375650

 

64

70

6

1.08

DDMAN20-52

1375950

 

25.5

30.5

5

1.46

 

 

 

50.5

51.5

1

0.65

 

 

 

63.5

64.5

1

0.76

 

 

 

69.5

79.5

10

4.03

 

 

including

76.5

79.5

3

10.4

 

 

 

93.5

99.4

5.9

0.55

 

 

 

104.4

116.5

12.1

1.78

 

 

 

133.5

150.5

17

4.18

 

 

including

141.5

145.5

4

9.14

 

 

 

157.5

164.5

7

9.57

 

 

including

161.5

164.5

3

15.6

 

 

 

170.5

171.5

1

0.66

DDMAN20-53

1375600

 

 

 

 

NSR

DDMAN20-54

1375750

 

109.5

112.5

3

0.67

 

 

 

118.5

165

46.5

6.15

 

 

including

120

126.5

6.5

10.3

 

 

and

132.5

142.5

10

10.1

 

 

 

172.5

174

1.5

0.76

DDMAN20-55

1380550

 

 

 

 

NSR

DDMAN20-56

1375850

 

7.5

75.5

68

3.98

 

 

including

27.5

42.5

15

8.1

 

 

and

64.5

66.5

2

14

DDMAN20-57

1375850

 

7.5

32.5

25

2.01

 

 

including

23.5

24.5

1

22.3

 

 

 

38.5

79.5

41

5.2

 

 

including

47.5

49.5

2

13.9

 

 

and

56.5

64.5

8

15.4

 

 

including

61.5

62.5

1

52.6

 

 

 

84.5

100.5

16

1.97

 

 

 

122.5

126.5

4

1.69

 

 

including

127.5

128.5

1

5.3

DDMAN20-58

1380900

 

 

 

 

NSR

DDMAN20-59

1376390

 

7.5

29.5

22

4.89

 

 

including

18.5

23.5

5

9.07

 

 

and

27.5

29.5

2

9.17

DDMAN20-60

1380800

 

68.3

69.3

1

1.67

 

 

 

103.3

107.3

4

0.57

 

 

 

 

 

 

 

DDMAN20-61

1375750

 

117.5

124.5

7

1.19

 

 

 

146.4

152.4

6

2.76

 

 

including

151.4

152.4

1

9.55

 

 

 

175.4

176.4

1

0.54

 

 

 

185.4

187.4

2

1.13

 

 

 

198.4

199.4

1

0.52

 

 

 

218.4

226.4

8

0.96

 

 

 

 

 

 

 

ACMAN20-466

1376390

 

18

28

10

0.99

ACMAN20-467

1376390

 

8

28

20

3

ACMAN20-469

1376390

 

12

48

36

1.12

ACMAN20-470

1376390

 

6

14

8

0.74

 

 

 

34

38

4

0.77

 

 

 

48

50

2

0.5

ACMAN20-471

1376390

 

10

18

8

1.68

 

 

 

24

26

2

0.52

ACMAN20-472

1376390

 

10

16

6

0.98

 

 

 

24

26

2

0.65

ACMAN20-473

1376390

 

10

22

12

0.59

 

 

 

44

48

4

2.97

ACMAN20-647

1376300

 

14

20

6

0.59

 

 

 

30

32

2

0.76

ACMAN20-654

1376300

 

14

22

8

0.81

 

 

 

30

36

6

1.27

 

 

 

42

48

6

0.48

ACMAN20-655

1376300

 

18

32

14

0.76

 

 

 

36

44

8

0.65

ACMAN20-656

1376300

 

36

44

8

0.81

 

 

 

48

50

2

0.63

ACMAN20-657

1376300

 

18

20

2

0.55

ACMAN20-660

1376350

 

34

46

12

2.8

ACMAN20-661

1376350

 

20

28

8

3.06

 

 

 

32

34

2

0.58

ACMAN20-662

1376350

 

8

10

2

2.07

ACMAN20-663

1376350

 

14

16

2

0.61

 

 

 

30

50

20

1.79

ACMAN20-664

1376350

 

8

14

6

0.45

 

 

 

18

26

8

1.41

 

 

 

44

50

6

0.61

ACMAN20-665

1376350

 

22

24

2

0.59

 

 

 

38

50

12

1.62

 

 

 

 

 

 

 

ACMAN20-337

1377470

 

6

7

1

0.7

ACMAN20-355

1375860

 

18

20

2

0.86

ACMAN20-357

1375860

 

18

19

1

0.83

 

 

 

34

38

4

1.29

ACMAN20-415

1377080

 

24

28

4

1.75

ACMAN20-491

1377580

 

0

2

2

0.68

 

Table 2: Drillhole ID Mankouke South (August 11, 2020)

Hole ID

XPT

YPT

ZPT

AZM

DIP

DDMAN20-42

262879

1376199

169

270

-50

DDMAN20-43

262781

1376200

168

270

-50

DDMAN20-44

262666

1375700

179

270

-50

DDMAN20-45

262831

1376200

168

270

-50

DDMAN20-46

262875

1376400

171

270

-50

DDMAN20-47

262720

1375698

179

270

-50

DDMAN20-48

262712

1376000

172

90

-50

DDMAN20-49

262720

1375650

175

270

-50

DDMAN20-50

262687

1376001

171

90

-63

DDMAN20-51

262674

1375649

173

270

-50

DDMAN20-52

262801

1375950

175

270

-50

DDMAN20-53

262722

1375599

173

270

-50

DDMAN20-54

262500

1375751

172

90

-50

DDMAN20-55

263360

1380550

161

90

-50

DDMAN20-56

262685

1375850

177

90

-50

DDMAN20-57

262625

1375850

178

90

-50

DDMAN20-58

263760

1380900

169

270

-50

DDMAN20-59

262456

1376389

178

270

-50

DDMAN20-60

263600

1380800

180

270

-50

DDMAN20-61

262455

1375750

172

90

-50

 

Qualified Person (QP) and NI43-101 Disclosure
Greg Isenor, P. Geo., Executive Vice-Chairman for the Company, is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 (“NI 43-101”) and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same.

About Roscan
Roscan Gold Corporation is a Canadian gold exploration company focused on the exploration and acquisition of gold properties in West Africa. The Company has assembled a significant land position of 100%-owned permits in an area of producing gold mines (including B2 Gold’s Fekola Mine which lies in a contiguous property to the west of Kandiole), and major gold deposits, located both north and south of its Kandiole Project in West Mali.

For further information, please contact:
Andrew J. Ramcharan, P.Eng

Executive Vice President – Corporate Development
Tel: (416) 572-2295
Email: aramcharan@Roscan.ca

Greg Isenor, P.Geo
Executive Vice-Chairman
Tel: (902) 902-221-2329
Email: gpisenor@Roscan.ca

Forward Looking Statements
This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information is characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate” and other similar words, or statements that certain events or conditions “may” or “will” occur. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, and other risks involved in the mineral exploration and development industry, including those risks set out in the Company’s management’s discussion and analysis as filed under the Company’s profile at www.sedar.com. Forward-looking information in this news release is based on the opinions and assumptions of management considered reasonable as of the date hereof, including that all necessary governmental and regulatory approvals will be received as and when expected. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information. The Company disclaims any intention or obligation to update or revise any forward-looking information, other than as required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.